INSTALLATION & REMEDIATION

Skylight Fall Protection.

Installation of skylight guards, mesh systems, and walkway protection over fragile rooflights and skylights.

STANDARD
ACR (M) 001:2019, BS EN 1873, HSG33
INSPECTION CYCLE
12 months (post-installation)
TURNAROUND
Site survey within 5 working days, installation quoted thereafter
CERTIFIED
ISO 9001 · 14001 · 45001
[SYSTEM ID: SHS-SVC-SKYLIGHT_FALL_PROTECTION / REV 01]

What it is

Rooflights and skylights are one of the most frequently overlooked fall hazards on a commercial roof. The HSE consistently identifies falls through fragile rooflights as a leading cause of fatal falls from height. A rooflight may look solid from above but in many cases is rated only for the weight of the manufacturer’s installation crew, not the weight of a maintenance worker walking across it years later.

Skylight fall protection systems are installed over and around the rooflight to prevent a person from falling through it. There are three principal approaches: rigid steel mesh guards installed over the dome, perimeter guardrails fitted around each rooflight, and walkway systems that route foot traffic away from fragile areas. The right approach depends on the rooflight type, the frequency of maintenance access, and the surrounding roof structure.

Installation is carried out to the ACR (M) 001:2019 test method for non-fragility, with reference to HSE guidance HSG33 (Health and safety in roof work). Any retrofit installation must not compromise the weatherproofing of the rooflight or the surrounding roof membrane, which is one of the most common reasons that DIY or non-specialist installations fail building warranty.

When it applies

  • Where rooflights have been identified as fragile or where their non-fragility status cannot be confirmed
  • Following a compliance check that has flagged rooflights as a residual risk
  • On industrial, warehouse, or commercial buildings with significant rooflight coverage
  • Where roof access is frequent and rooflight proximity to access routes is unavoidable
  • Following any near-miss involving rooflight access

The process

  1. Site survey. Engineer attends and surveys every rooflight on the roof. Rooflight type, condition, surround structure, and access pattern documented.
  2. Specification. Appropriate protection system specified for each rooflight or zone, with reference to ACR (M) 001:2019.
  3. Quotation. Fixed-price quotation issued covering supply and installation.
  4. Installation. Carried out by our own engineers without disrupting the building’s normal operation.
  5. Certification. Installation certificate issued on completion, with photographic record of every protected rooflight.

What you receive

  • Installation certificate to ACR (M) 001:2019 and HSG33
  • Site survey with annotated roof plan
  • Specification document covering product, fixing, and installation method
  • Photographic record of every protected rooflight
  • 10-year product warranty (typical, varies by product)
  • 12-monthly inspection cycle to confirm continued non-fragility status
  • Inclusion in the next annual compliance check at no additional survey cost

Skylight Fall Protection — common questions.

Which British Standards does the installation comply with?

Every installation is engineered and certified to ACR (M) 001:2019, BS EN 1873, HSG33. The installation certificate references the applicable BS EN / BS standard for each system component, and the installation is entered into a 12 months (post-installation) recertification cycle from the day of handover.

Do you handle the design as well as the installation?

Yes. Every install starts with a site survey and a structural assessment of the building's mounting capacity. The system layout, anchor positions, and structural fixing schedule are designed by our engineers and verified against the relevant BS EN / BS standard before installation begins.

Is the install covered by an annual inspection regime after handover?

Yes — every install we complete is included in the next 12 months (post-installation) recertification cycle. The certificate, structural calculation pack, photographic record, and as-built drawings are filed against the asset and the next test is scheduled before our engineers leave site.

What does the deliverable pack look like?

Installation certificate referencing ACR (M) 001:2019, BS EN 1873, HSG33, as-built drawings, structural calculation pack, pull-test records for each anchor where applicable, photographic record of installation, and a written user method statement. Filed digitally and supplied as a single audit-ready PDF on the day of handover.

Can you take on remedial works following an inspection by another contractor?

Yes. We routinely take on remediation work where another contractor has inspected and flagged defects. We carry out our own pre-install survey to confirm the scope, quote fixed-price, and complete the works to current standards with full certification handover.

Find out where you stand. In ten minutes. At no cost.

Answer twelve questions about your building, your existing systems, and your last test dates. We send back a written compliance status report with the gaps prioritised by risk and a clear next step for each.

  • No site visit required to start
  • Written report within two working days
  • Risk-prioritised gap analysis
  • No obligation to proceed with any work
Start Compliance Check
SAMPLE OUTPUT COMPLIANCE REPORT
Guardrail system PASS
Mansafe cable line RECERTIFY
Eyebolts (12 points) FAIL
Roof access ladder PASS
Skylight protection MISSING

Tell us about your building.
We'll tell you where you stand.

For installation enquiries, inspection bookings, or compliance questions: send us a brief description of the site and the systems you have, or send your last test report. We respond within one working day, often the same day.

PHONE · LONDON
0204 572 5223
PHONE · HEAD OFFICE
07450 053021
RESPONSE TIME
Within 1 working day
By submitting, you agree to be contacted about your enquiry. We don't share your details. Read our privacy policy.