FREE COMPLIANCE CHECK

Free compliance check.

Answer 12 questions about your building, your existing systems, and your last test dates. We respond with a written compliance status report within two working days. No site visit required to start.

[SYSTEM ID: SHS-CC / REV 01]

Three things that get
facilities managers
prosecuted under the
Work at Height Regulations 2005.

The HSE doesn't care that the system was installed correctly fifteen years ago. They care whether it has been tested in the last twelve months, whether the certification is current, and whether it meets the standards in force today.

01

Equipment that hasn't been tested in 12 months (or 6 months for some systems)

Fall arrest systems, mansafes, eyebolts and guardrails require inspection by a competent person at least every twelve months — and every six months for certain systems. Anything beyond its test interval is non-compliant by default, regardless of how it looks.

02

Missing or out-of-date certification

If you can't produce current test certificates on request, your system is assumed non-compliant. Most prosecutions hinge on the documentation, not the equipment itself.

03

Systems that don't meet current British Standards

BS EN 795 for anchor devices, BS 7883:2019 for installation, BS 8437 for selection and use. Systems installed to older standards still need to meet today’s requirements to remain compliant.

A written compliance report. Two working days. No site visit.

  • A written compliance status report, returned by email within two working days
  • A pass / recertify / fail / missing classification for every system you have on site
  • A risk-prioritised list of remediation, ordered by what would get a facilities manager prosecuted first
  • British Standards references for every item flagged, so you can take the report straight to your H&S file
  • A fixed-price quotation for any inspection or installation work, if you want one
  • No site visit required to produce the report, and no obligation to proceed with any work

Tell us about your building.

Takes about 10 minutes. Required fields only. Your contact details are captured on the last step.

1. Building type

This is what the report looks like.

One row per system on your site. Each row classified pass, recertify, fail, or missing, with a corresponding next step.

SAMPLE OUTPUT COMPLIANCE REPORT
Guardrail system PASS
Mansafe cable line RECERTIFY
Eyebolts (12 points) FAIL
Roof access ladder PASS
Skylight protection MISSING

From submission to written report.

Four steps. Two working days. No site visit required to start.

01
SUBMIT

You complete the 12 questions

Takes about 10 minutes. No upload of documents required at this stage. We work from your answers and then come back with any clarifications.

02
TRIAGE

A senior engineer reviews your answers

Within one working day. We may send a single short follow-up by email if anything needs clarification before the report is written.

03
REPORT

You receive a written compliance status report

Within two working days of submission. Each system pass / recertify / fail / missing, with British Standards references and a clear next step for each item.

04
YOUR CHOICE

You decide what, if anything, to do next

No obligation. If you want a fixed-price quote for any of the remediation, we will issue one. If you want to take the report to a different contractor, that is fine too.

Tell us about your building.
We'll tell you where you stand.

For installation enquiries, inspection bookings, or compliance questions: send us a brief description of the site and the systems you have, or send your last test report. We respond within one working day, often the same day.

PHONE · LONDON
0204 572 5223
PHONE · HEAD OFFICE
07450 053021
RESPONSE TIME
Within 1 working day
By submitting, you agree to be contacted about your enquiry. We don't share your details. Read our privacy policy.